Projects
Riverside Medical Tower
12-story domestic water riser rebuild, 240 fixtures, pressure-balanced loop, 18-week closeout.
Harborline Condominiums
180-unit cold/hot recirculation retrofit with isolation manifolds and zone metering per dwelling.
Northgate Industrial Park
Process water mains, 8-inch HDPE fusion, backflow prevention, four-metered buildings.
Westmere Custom Residence
Whole-home filtration, softener, dedicated boiler feed, and PEX manifold home-run plumbing.
Cedar Bluff School District
Six campus potable systems, lead-free certified, peak-demand calibrated for occupancy loads.
Foundry Square Mixed-Use
Combined fire suppression, domestic, and rainwater harvesting header beneath one slab.

Every project, fully documented and hydrostatically verified
From rough-in to final commissioning, each installation receives as-built drawings, pressure-test certificates, and fixture-by-fixture turnover reports logged in our project archive.
Our field teams photograph every concealed connection before close-up, giving building owners verifiable evidence of code-compliant materials, joint integrity, and slope accuracy.
Review Project Archive →
Plan your next installation with documented confidence
Request a project consultation and receive a sample turnover package from a comparable completed site.
Schedule a Consultation →